Asphalt Shingle Roof Replacement in Connecticut

Full tear-off and replacement in asphalt shingles — three-tab vs. architectural, real pricing, and what a good replacement includes.

What a full asphalt replacement includes

A real replacement is a system, not a shingle swap. The crew strips the old roof to the deck, replaces soft or rotted plywood, lays underlayment and ice-and-water shield at the eaves and valleys, installs new flashing at every penetration, and finishes with the shingle line you chose — plus ridge ventilation so the new roof lasts as long as the shingle is rated for. Any quote that skips the shield, the flashing, or the ventilation is not a cheaper roof; it's a shorter one.

Three-tab vs. architectural: the honest comparison

Three-tabArchitectural
LookFlat, uniform, single-layer profileDimensional, layered profile that reads like wood shake from the street
Typical cost (2,000 sq ft home)$9,000–$15,000$11,000–$20,000
Wind resistanceLower ratings; more vulnerable to lifting in stormsHigher ratings; heavier mat and better sealing
Algae resistanceOften limitedCommonly available with algae-resistant granules — worth it on shaded, wooded lots
Best forBudget replacements, rentals, short staysMost owner-occupied Hartford County homes

When replacement beats repair

Repairs make sense on a young roof with isolated damage — a few shingles lost to wind, one flashing failure. They stop making sense when the roof is past 20 years, granule loss is widespread, leaks appear in more than one place, or the decking is soft underfoot. At that point every repair buys months, and the money spent patching is money not spent on the replacement you'll need anyway. Our replacement-vs-repair guide walks through the triage honestly.

What to ask before you sign

  • How many layers are coming off? Two layers doubles tear-off time and disposal cost — it should be in the quote, not discovered on day one.
  • What's the decking deal? Per-sheet pricing in writing, agreed before tear-off.
  • What's the ventilation plan? Intake and exhaust, sized for the attic — not just a ridge vent slapped on a closed system.
  • Who pulls the permit? Your roofer should, and the permit should be in the quote.

Get a free quote for this work. Request your free quote →

Get a Free Roof Quote

Two minutes. Matched with a local roofer. Free written estimate, no obligation.

Get My Free Quote